Construction loan settlement is the point where your final progress payment is made and the loan is ready to run as a normal home loan. If you are building in Campbelltown, knowing how that last stage works helps you avoid cash flow surprises at the finish line.
This article walks through what happens at the end of a build, what to check with your lender, and one example with real numbers. Lender rules differ, so treat this as a general guide and check your own loan contract.
What Is Construction Loan Settlement?
Construction loan settlement is the final stage of a build, when the last progress payment is released to your builder and the loan moves to the repayment arrangement set out in your contract. Unlike buying an existing home, there is no single settlement day. Money is released in stages as the work is done.
On a typical build, the lender pays the land purchase first if you are buying land at the same time. Then it releases progress payments to your registered builder as each stage is finished. Settlement of the build is the last of those payments, usually after practical completion.
If you want the bigger picture on how these loans are structured, our construction loans page covers the options available from lenders across Australia.
How Does a Construction Draw Schedule Work?
A construction draw schedule sets out the stages at which your lender releases money to the builder, and each release is tied to work that has actually been completed. You only pay interest on the amount drawn down, not on the full loan limit.
In NSW, a building contract over $20,000 must include a progress payment schedule. Payments must match work actually carried out, and the maximum deposit is 10 per cent under the Home Building Act 1989 (NSW). Lenders set their own drawdown requirements, which may include a progress claim from the builder and an inspection before funds are released, so check your loan contract. Building Commission NSW gives $250 to $500 as an indicative cost for each progress inspection, so it is worth asking whether your lender charges its own fee as well.
The trade-off is that you will start making repayments as soon as the first progress payment is made. NSW Government guidance says borrowers financing a project home start repayments once they begin to draw down. That means you may be paying rent or another mortgage at the same time as you pay interest on the build.
What Happens at the Final Progress Payment?
The final progress payment is released once the builder reaches practical completion and your lender is satisfied the home is finished. Final drawdown requirements are set by each lender and may include completion documents, so check your loan contract and ask your lender what it needs.
As an example, consider a Campbelltown couple building a home on land they already own. Their loan limit is $600,000 and their contract has the usual stages: base, frame, lock-up, fixing and completion. By the final stage they have drawn $570,000, and the last $30,000 is held back until the home is finished.
The builder finishes, the couple walk through the home and note two small defects. They raise these with the builder before signing off. Once the lender receives the completion documents, it releases the last $30,000, and the loan sits at the full $600,000.
At the illustrative rate of 6.75% p.a., interest on $600,000 for a year is about $40,500, or roughly $3,375 a month on an interest-only basis. If the loan then moves to principal and interest over 30 years at the same illustrative rate, the monthly repayment is about $3,891. Actual rates and repayment options depend on your lender and your loan. The outcome for the couple is a loan that moves smoothly to ongoing repayments, because they held back the final payment until the defects were dealt with.
Ready to get started?
Book a chat with a Finance & Mortgage Broker at Credible Finance today.
Do You Need to Refinance After the Build Finishes?
You do not always need to refinance after a build, but many borrowers review their loan at completion because a construction to permanent loan may switch to a standard home loan automatically. Whether it does, and on what rate, depends on your lender.
It is worth checking if your loan converts to a rate that suits you once the home is finished. A loan health check can show whether your new repayments still fit your budget, and refinancing is an option if another lender offers terms that suit you more. Refinancing can involve fees and a new application, so compare the full cost before you move.
Why Your Serviceability Still Matters
Your lender assesses whether you can afford repayments at a rate well above the loan rate, and this applies to construction loans too. APRA's guidance is that lenders must assess new borrowers at a rate at least 3 percentage points above the loan product rate, and APRA confirmed this buffer was unchanged in May 2026.
There is a useful detail for builders. Finance for building new dwellings is exempt from APRA's debt-to-income limit, but the exemption does not remove the serviceability assessment. Your lender will still test your income and expenses. You can get a feel for your position with our borrowing capacity page before you lock in a contract.
Can First Home Buyers Claim the Grant at Settlement?
First home buyers building in NSW may be eligible for the $10,000 First Home Owner Grant, and applications for settlement or a first drawdown are lodged through the approved agent providing the finance. For vacant land with a building contract, the combined value of land, contract and any variations must not exceed $750,000.
The home must also be lived in as your principal place of residence within 12 months of construction or purchase, for at least 12 continuous months, for contracts signed on or after 1 July 2023. Eligibility depends on your circumstances, so confirm it before you apply. Our first home buyers page explains how we help with this.
What Costs Catch Builders Out at the End?
Costs at the end of a build can include inspection fees, any lender fees and variations to the contract. Each lender sets its own fees, so ask for them in writing before you sign.
Variations are the big one. If you change fittings or layout during the build, your builder will usually claim the extra cost, and your lender may need to approve a higher loan amount or you may need to pay from savings. Keep a buffer in case the final stage costs more than you planned.
Frequently Asked Questions
What is construction loan settlement?
It is the final stage of a build when the last progress payment is released to your builder and the loan moves to its ongoing repayment arrangement. Money is paid in stages rather than on one day.
Do I pay interest on the whole construction loan?
You pay interest only on the amount drawn down, not on the full loan limit. Repayments usually begin once the first progress payment is made.
How many progress payments are allowed in NSW?
NSW law requires a progress payment schedule for contracts over $20,000, and payments must match the work actually carried out. The number of stages is set in your contract and by your lender.
Do I need to refinance after my build is finished?
Not always, because some loans convert to a standard home loan once the build is complete. It is worth reviewing your rate and repayments at that point.